Development Application Mod26/0074
Modification Section 4:55 (1a) to the design of the basin from a dam-style basin to a wetlands style basin
(Submitted: 01/05/2026)
Development Application Mod26/0072
Modification Section 4:55 (1a) to the design of the basin from a dam-style basin to a wetlands style basin.
(Submitted: 30/04/2026)
Development Application Mod26/0071
The proposal seeks approval to modify the design of the basin from a dam-style basin to a wetlands style basin. The revised design results in the exact same footprint as approved and will therefore not
increase the area of disturbance, no additional vegetation removal is required.
(Submitted: 29/04/2026)
Development Application Mod26/0068
The proposal seeks approval to modify the design of the basin from a dam-style basin to a wetlands-style basin. The revised design results in the exact same footprint as approved and will therefore not increase the area of disturbance, no additional vegetation removal is required.
(Submitted: 22/04/2026)
Development Application DA19/0811
Vegetation Removal and Construction of a Stormwater Detention Basin (Basin I)
(Submitted: 22/11/2019)